COMMERCIAL WAVERIDER BOATS

DUE TO THE EXISTING LEVEL FLOTATION, OUTSTANDING STABILITY AND HANDLING,
WAVERIDERS MAKE EXCELLENT COMMERCIAL BOATS

Whether you're trying to get a boat through survey or starting a commercial boat business from scratch, we know it can be a real headache. So we've made the process easier by building all our Waverider Boats with level flotation as standard.

See the list of completed builds at bottom of page.

LEVEL FLOTATION ALREADY CERTIFIED

With Waverider Boats already having the hard work of Level Flotation fitted & certified, it's far easier to alter a few things in a Waverider for survey requirements, than to start from scratch with a boat that only has basic or positive flotation.

PORT SIDE
PORT SIDE
AMSA APPROVED FOAM
DECK VIEW
Flotation placement in Waverider Boats shown on deck plan
TOTAL COMBINED
STARBOARD SIDE
STARBOARD SIDE
ANNEX D FOAM DISTRIBUTION SPECS

Calculating the amount of foam needed and how much foam will fit in each nook and cranny is a tedious and meticulous job that we've done for you.

If your boat's layout or requirements vary from the existing layouts available, then new calculations will need to be done, but adding a little more foam is far easier than starting from scratch.

Example of the carpet available, and the great toe room under the covered side flotation.

BEAUTY OF LINED SIDES

Double lined sides ensure the foam is hidden, but we've allowed for your feet to fit easily underneath with a 100mm space. Though it's more work to raise the join, rather than welding the side sheet straight to the floor, the beauty is no stubbed toes, and more internal floor space is gained as you can stand much closer to the sides - offering greater support and safety.

 

The double hull also means a quieter ride, as the foam filled sides act as sound insulation and also make the hull cooler in temperature too.

During construction, the big 550.

COMPLETED COMMERCIAL CONTRACTS

SEQ WATER, 2018 - WAVERIDER 550 CC

Photos taken during commissioned sea-trial.

SEQ Water boat, built to survey for government use.
SEQ Water needed plenty of storage, work room and seating.
Gotta love the safer handling and quick turning abilities.

QLD FISHERIES, 2018 - WAVERIDER 500 SC WITH GANTRY

Photos taken during commissioned sea-trial.

IMG_6336_cr_sm
IMG_6252_sm
IMG_6382_SMALL

AUSTRALIAN MARITIME, 2018 - WAVERIDER 500 CC AMPHIBION (WITH WHEELS)

Due to the confidentiality of this client, we can not share the photos online. Interested parties, please contact us for photos.

COMMERCIAL WAVERIDERS IN PRODUCTION

PHOTOGRAPHS WILL BE POSTED BELOW ONCE EACH BUILD IS COMPLETE

The level flotation in Waverider boats meets the strict National Standard for Commercial Vessels and all the criteria outlined in NSCV-020

  • Commercial client - Waverider 550 Centre Console.
    • Expected finish date: Sep 2018

 

Please contact us for more information.

Glossy-metal-badge-made-in-Australia-with-flag
Logo wr 800
Marine Safety Innovations Pty Ltd
ABN # 53 141 908 385

AUSTRALIAN REGISTERED HULL DESIGN #344536
KAPTEN HYDROFOIL WING PATENT # 2012101872
760 Bruce Hwy, Chatsworth, 4570, Queensland, Australia
info@WaveriderBoats.com.au
Ph: 07) 5481 6133 or 0467 506 131
COPYRIGHT 2023 WAVERIDER BOATS