THE PROCESS OF ORDERING YOUR WAVERIDER BOAT

Where to start & what happens next

Dad May 2016

1. HAVE A CHAT

We'd love to hear from you - whether it's face-to-face, an email, a phone call, or even via Facetime -We're keen to hear what you are looking for in your dream boat, and to see how we can best meet your ambition.

If you've got questions, we'll answer them all, and when we know what you're after, we'll email you a general quote for your consideration.

IMG_4634 (1)

2. OPTIONS

If you're happy to proceed, we run through the options available and go through your wish-list in more detail for your boat size. When you're satisfied all your boxes are ticked, we'll present a more itemised quote, listing any and all particulars you've requested, for further consideration.

IMG_4594 (1)

3. TEST DRIVE

When the only thing left is a test ride, book in for an offshore trip and enjoy some wind in your hair! You can thoroughly test the boat's performance, including stability at rest, bar-crossing, flat(ish) bay conditions, ocean swells, and of course, experience the easy drive on/off, launch & retrieve.

thumb-422558_640

4. CONTRACT

When you accept the quote, and our terms of trade, we both sign the Builders Contract. With your deposit, you receive a congratulations package, including drawings of your boat for your reference, and your boat's own Hull Identification Number.

micks

5. BUILD

As soon as the aluminium cut-file arrives, a lot changes regularly, so every 1-2 weeks, you'll receive an email containing a detailed progress report, with photos, so you have a clear understanding and a concise record of your boat's construction.

micks handover

6. HAND-OVER

When your boat is ready to collect, we'll walk you through the boat and discuss its features and all proper maintenance that's required, so you're confident with your new boat before taking it home or accepting delivery.

 

 

Matt - the new owner of the WR550CC+H, 2018.

WAVERIDER TERMS OF PAYMENT

BARE HULL

-Phase 1
  1. 50% down, secures spot on build list.
  2. Aluminium cut-file is ordered.
  3. 25% due, when build starts.
  4. 25% balance due, at hand-over.

Build time: approx. 8 - 10 weeks.

BASIC HULL

-Phase 2
  1. 50% down, secures spot on build list.
  2. Aluminium cut-file is ordered.
  3. 25% due, when build starts.
  4. Interior is built & finished.
  5. Trimmings & extras fitted & finished.
  6. 25% balance due, at hand-over.

Build time: approx. 10 - 12 weeks.

THE WORKS + TRAILER

-Phase 3
  1. 50% down, secures spot on build list.
  2. Aluminium cut-file & trailer parts ordered.
  3. Trailer is built.
  4. 25% due, when build on hull starts.
  5. Interior built & finished.
  6. Trimmings & extras fitted & finished.
  7. 25% balance due, at hand-over.

Build time: approx. 12 - 16 weeks.

ORDER YOUR WAVERIDER OR ASK QUESTIONS

Discover the Waverider that's right for you.

Glossy-metal-badge-made-in-Australia-with-flag
Logo wr 800
Marine Safety Innovations Pty Ltd
ABN # 53 141 908 385

AUSTRALIAN REGISTERED HULL DESIGN #344536
KAPTEN HYDROFOIL WING PATENT # 2012101872
760 Bruce Hwy, Chatsworth, 4570, Queensland, Australia
info@WaveriderBoats.com.au
Ph: 07) 5481 6133 or 0467 506 131
COPYRIGHT 2023 WAVERIDER BOATS